01 Dec 2015 00:03
Aikivuori A (1996) Periods and demand for private sector housing refurbishment, Construction Management and Economics, 14: 3-12 Al-Hajj A (1991) Simple cost-significant models for total lifecycle costing in buildings. PhD Thesis, Department of Civil Engineering, University Of Dundee Al-Hajj A (1996) Towards a better understanding of life cycle costing in buildings: a simple approach to modelling, Proceedings of the CIB W89 conference, Beijing, October 21- 24 1996 Al-Hajj A and Horner M W (1998) Modelling the running costs of buildings, Construction Management and Economics, 16: 459-470 Al-Hajj A and Aouad G (1999) Life cycle costing model using object oriented and VR technologies, Proceedings of the eighth international conference on durability of building materials and components, Vancouver, Canada, May 30 - June 3, 4: 2901-2908 Anderson T and Brandt E (1999) The use of performance and durability data in assessment of life time serviceability, Proceedings of the eighth international conference on durability of building materials and components, Vancouver, Canada, 3: 1813-1820 Aouad G, Child T, Marir F and Brandon P (1997) OSCON final report, University of Salford Ashworth A and Skitmore R M (1982) Accuracy in estimating. Chartered Institute of Building Occasional Paper No 27 Ashworth A (1987) Life cycle costing – can it really work in practice? in Brandon P S (ed), Building cost modelling and computers, E F N Spon, London Ashworth A (1989) Life cycle costing: a practice tool, Cost Engineering, 31(3): 8-11 Ashworth A (1993) How life cycle costing could have improved existing costing, in Bull J W (ed), Life cycle costing for construction, Blackie Academic Professional, Glasgow Ashworth A (1996a) Estimating the life expectancies of building components in life cycle costing calculations, Structural Survey, 14 (2): 4-8 Ashworth A (1996b) Assessing the life expectancies of buildings for life cycle costing, Proceedings of the RICS construction and building research conference (COBRA’96), RICS Ashworth A (1999) Cost studies of buildings, Longman Asiedu Y and Gu P (1998) Product Life cycle cost analysis: state of the art review, International Journal of Production Research, 36 (4): 883-908 ASTM (1983) Standard practice for measuring life-cycle costs of buildings and building systems, American Society for Testing and Materials, Designation: E917-83 Bartlett E and Howard N (2000) Informing the decision makers on the cost and value of green building, Building Research Information, 28 (5/6): 315–324 Bhuta C and Sarma V (1997) Life cycle costs and early decision, Building Economist, March: 4-8 BMI (2001) BMI Building maintenance price book 2001, RICS, London Bordass B (2000) Cost and value: fact and fiction, Building Research Information, 28 (5/6): 338-352 Brandon P S (1987) Life cycle appraisal – further considerations, in Spedding A (Ed) Building maintenance economics and management, E F N Spon, London: 153-162 BSI (1974) BS3811: British standard glossary of maintenance of physical resources, Department of Industry BSI (1997) BS 5760: Reliability of systems, equipment and components, Part 23, Guide to life cycle costing, British Standard Institution BSI (2000,) BS ISO 15686-1:2000, Buildings and constructed assets: Service life planning: General principles, British Standard Institution Bromilow F J and Pawsey M R (1987), Life cycle cost of university buildings, Construction Management and Economics, 5, S3-S22 Bromilow F J and Tucker S N (1983) Terotechnological optimality in construction, Construction Papers, 2 (1): 41-50 Buckley J U (1987) The fuzzy mathematics of finance, Fuzzy Sets and Systems, 21: 257-273 Bull J W (1993) The way ahead for life cycle costing in the construction industry, in Bull J W (ed) Life cycle costing for construction, Blackie Academic Professional, Glasgow Byrne P (1995) Fuzzy analysis: a vague way of dealing with uncertainty in real estate analysis, Journal of Property Valuation and Investment, 3 (3): 22-40 Byrne P (1996) Risk, uncertainty and decision-making in property development, E F N Spon, London Byrne P (1997) Fuzzy D C F: a contradiction in terms, or a way to better investment appraisal?
Proceedings of Cutting
Edge 97, RICS
CBPP (1998a) Introduction to whole life costing
cbpp.org.uk/cbpp/word_docs/whole_life_costing.doc
CBPP (1998b) Business benefits for whole life costing
cbpp.org.uk/cbpp/word_docs/Whole_Life_Costing_
Business_Benefits.doc
Chen S (1995) An empirical examination of capital
budgeting techniques: impact of investment types and firm
characteristics, Engineering Economist, 40 (2): 145-170
Chinyio E A, Olomolaiye P O and Corbett P (1998) Evaluation
of the project needs of UK building clients, International
Journal of Project Management, 16 (6): 385-391
Chiu C Y and Park C S (1994) Fuzzy cash flow analysis using
present worth criterion, The Engineering Economist, 39 (2):
113-138
Ciribini A, De AnGelis E and Marasso L (1993) Life cycle
costing in the refurbish and rehabilitation projects, Economic
evaluation and the built environment, Lisbon 1993: 21-33
Clift M and Bourke K (1999) Study on whole life costing, BRE
Report 367, CRC
Clemen R T and Winkler R L (1999) Combining probability
distributions from experts in risk analysis, Risk Analysis 19
(2): 187-203
Committee for Terotechnology (1977) Life cycle costing in
the management of assets, Her Majesty’s Stationery Office,
London
CPN (2000) Whole life costing: the new BS-ISO standard,
Members’ report E01444, CIRIA
Curwin J and Slater R (1996) Quantitative methods for
business decisions, Fourth edition, International Thomson
Business Press, London
Dale S J (1993) Introduction to life cycle costing, in Bull J W
(ed) Life cycle costing for construction, Blackie Academic
Professional, Glasgow
Edwards P J and Bowen P A (1998) Practices, barriers and
benefits of risk management process in building services
cost estimation: comment, Construction Management and
Economics, 16: 105-108
Edwards S, Bartlett E and Dickie I (2000) Whole life costing
and life-cycle assessment for sustainable building design, BRE
Digest 452, CRC, London
El-Haram M A and Horner R M W (1998) Factors affecting life
cycle cost in the construction industry, Proceedings of the 8th
International MIRCE Symposium: 229-240
Fabrycky W J and Blanchard B S (1991) Life-cycle cost and
economic analysis, Printice-Hall Inc, NJ
Ferrari P and Savoia M (1998) Fuzzy number theory to obtain
conservative results with respect to probability, Computer
Methods in Applied Mechanics and Engineering, 160 (3-4):
205-222
Ferry D J O and Flanagan R (1991) Life cycle costing – a
radical approach, CIRIA Report 122, London
Finch E F (1994) The uncertainty role of life cycle costing
in the renewable energy debate, Renewable Energy, 5 (II):
1436-1443
Flanagan R, Norman G and Furbur D (1983) Life cycle costing
for construction, Surveyors Publications
Flanagan R, Kendell A, Norman G and Robinson G (1987)
Life cycle costing and risk management, Construction
Management and Economics, 5: 53-71
Flanagan R, Norman G, Meadows J and Robinson G (1989)
Life cycle costing – theory and practice, BSP Professional
Books
Flanagan R and Norman G (1993) Risk management and
construction, Blackwell Scientific Publications
Garnett N and Owen K (1995) Life cycle costing techniques:
how the construction industry could learn from other
industries, the RICS Construction and Building Research
Conference (COBRA’95)
Goumas M G, Lygerou V A and Papayannakis L E (1999)
Computational methods for planning and evaluating
geothermal energy projects, Energy Policy, 27: 147-154
Griffin J J (1993) Life cycle cost analysis: a decision aid, in
Bull J W (ed), Life cycle costing for construction, Blackie
Academic Professional, Glasgow
HAPM (1992) HAPM Component life manual, E F N Spon,
London
HAPM (1999a) HAPM Component life manual CD-ROM,
Housing Association Property Mutual Ltd, London
HAPM (1999b) Guide to defect avoidance, Housing
Association Property Mutual Ltd, London
HAPM (1999c) Workmanship checklists, Housing Association
Property Mutual Ltd, London
Hermans M H (1999) Building performance starts at handover:
the importance of life span information, Proceedings of
the eighth international conference on durability of building
materials and components, Vancouver, Canada, May 30 -
June 3, 3: 1867-1873
HMSO (1992) Life cycle costing, HM Treasury, Her Majesty’s
Stationery Office, London
HMSO (1991) Economic appraisal in central government: a
technical guide for government departments, HM Treasury,
Her Majesty’s Stationery Office, London
HMSO (1997) The green book – appraisal and evaluation in
central government: treasury guidance, HM Treasury, Her
Majesty’s Stationery Office, London
Hoar D and Norman G (1990) Life cycle cost management,
in P S Brandon (Ed) Quantity surveying techniques – new
directions, BSP Professional Books, Oxford
Hobbs S (1977) Collection and use of building maintenance
cost data, Building Research Establishment (BRE),
Department Of Environment, Current Paper October 1977
Hodges N (1996) The economic management of physical
assets, MEP, London
Holmes R, Droop C and Mellor P (1985) A coding system for
building maintenance, Technical Information Service No. 47,
The Chartered Instsitue of Building
Jovanovic P (1999) Application of sensitivity analysis in
investment project evaluation under uncertainty and risk,
International Journal of Project Management, 17 (4): 217-222
Kahraman C and Tolga E (1995) The effects of fuzzy inflation
rate on after-tax rate calculations, Third Balkan Conference
on Operational Research, Thessaloniki, Greece, 16-19
October
Kahraman C, Tolga E and Ulukan Z (2000) Justification of
manufacturing technologies using fuzzy benefit/cost ratio
analysis, International Journal of Production Economics, 66:
45-52
Kaufmann A and Gupta M M (1985) Introduction to fuzzy
mathematics, Van Nostrand Reinhold Inc, New York
Kaufmann A and Gupta M M (1988) Fuzzy mathematical
models in engineering and management science, Elsevier
Science Publishers B V, Netherlands
Kelly J and Male S (1993) Value management in design and
construction, E F Spon
Khanduri A C, Bedard C and Alkass S (1993) Life cycle
costing of office buildings at the preliminary design
stage, Developments in civil and construction engineering
computing, August: 1-8
Khanduri A C, Bedard C, and Alkass S (1996) Assessing
office building life cycle costs at preliminary design stage,
Structural Engineering Review, 8 (2-3): 105-114
Kirk S J and Dell’Isola A J (1995) Life cycle costing for design
professionals, McGrew-Hill Book Company, New York
Kirkham R J, Boussabaine, Grew R G and Sinclair S P (1999)
Forecasting the running costs of sport and leisure centres,
Proceedings of the eighth international conference on
durability of building materials and components, Vancouver,
Canada, May 30 – June 3, 3: 1728-1738
Kishk M (2001) An integrated fuzzy approach to whole life
costing based decision making, Unpublished PhD thesis, Scott
Sutherland School, The Robert Gordon University
Kishk M and Al-Hajj A, (1999) An integrated framework for
life cycle costing in buildings, Proceedings of COBRA 1999
– The challenge of change: construction and building for the
new millennium, RICS, Vol 2: 92-101
Kishk M and Al-Hajj A (2000a) A fuzzy approach to model
subjectivity in life cycle costing, Proceedings of the BF2000
national conference of postgraduate research in the built and
human environment, 9-10 March 2000, The University of
Salford: 270-280
Kishk M and Al-Hajj A (2000b) A fuzzy model and algorithm
to
handle subjectivity in life cycle costing based decisionmaking,
Journal of Financial Management of Property and
Construction, No 1-2, Vol 5: 93-104
Kishk M and Al-Hajj A (2000c) Modelling of life cycle costs of
alternatives with different lives, accepted for publication, the
16th annual conference of the Association of Researchers in
Construction Management, Glasgow Caledonian University,
6-8 September 2000, Vol 2: 577-586
Kishk M and Al-Hajj A (2000d) Handling linguistic
assessments in life cycle costing – a fuzzy approach,
Proceedings of COBRA, RICS Research Foundation: 228-243
Kishk M and Al-Hajj A (2001a) Integrating subjective and
stochastic data in life cycle costing calculations, Proceedings
of the first international postgraduate research conference in
the Built and Human Environment: 329-345
Kishk M and Al-Hajj A (2001b) An innovative approach to
integrating the analysis of uncertainty into life cycle costing,
Proceedings of the first international conference of Innovation
in Architecture, Engineering and Construction: 411-421
Kishk M, Al-Hajj A and Pollock R (2001) Inclusion of nonfinancial
factors in life-cycle decision-making – a fuzzy
approach, Proceedings of the 17th Annual Conference of the
Association of Researchers in Construction Management, 1:
411-420
Ko W I, Choi J W, Kang C H and Lee J S (1998) Nuclear fuel
cycle cost analysis using a probabilistic simulation technique,
Annals of Nuclear Energy, 25: 771-789
Kosko B (1997) Fuzzy engineering, Prentice Hall International
Inc, NJ
Kuchta D (2000) Fuzzy capital budgeting, Fuzzy Sets and
Systems, 111: 367-385
Larsson N and Clark J (2000) Incremental costs within
the design process for energy efficient buildings, Building
Research Information, 28 (5/6): 413–418
Liang P and Song F (1994) Computer-aided risk evaluation
system for capital investment, Omega, 22 (4): 391-400
Lopes M D S and Flavell R (1998) Project appraisal – a
framework to assess non-financial aspects of projects during
the project life cycle, International Journal of Project
Management, 16(4): 223-233
MacKay S (1999) Building for life, the Building Economist:
4-9
Martin J (1992) Occupancy costs, Construction Papers No. 3,
CIOB
Mathur K and McGeorge D (1990) Property maintenance
– a simulation approach, Proceddings of CIB 70 Conference,
Singapore: 162-171
McDermott F, Torrance V B and Chessman P G (1987)
Forecasting lifespan for life cycle costing, in Spedding A (Ed),
Building maintenance economics and management, E F N
Spon, London
McGeorge J F (1993) The quality approach to design and life
cycle costing in the health service, in Bull J W (Ed) Life cycle
costing for construction, Blackie Academic Professional,
Glasgow
Mohamed S and McCowan A K (2001) Modelling project
investment decisions under uncertainty using possibility
theory, International Journal of Project Management 19: 231-
241
Neely Jr E S and Neathammaer R (1991) Life-cycle
maintenance cost by facility use, Journal of Construction
Engineering And Management, 117 (2): 310-320
Norton B (1992) Value added, Chartered Quantity Surveyor,
June: 21-23
Paulson B C (1976) Designing to reduce construction costs,
Journal of Construction Division, ASCE, 102: 587-592
Picken D H (1989) An investigation into the development and
practice of life cycle costing for construction, MSc Thesis,
Department of Civil Engineering, University of Salford
Piper J (1996) Window selection economics: to achieve the
mostcost-effective solution, you’ll need to evalutae life-cycle
costs, Trade Press Publishing Corporation
RICS (1986) A guide to life cycle costing for construction,
Surveyors Publications
RICS (1987) Life cycle costing: a worked example, Surveyors
Publications
RICS (1999) Surveyors’ construction handbook, RICS
Business Services Limited, London
RICS/BRE (1992) Life expectancies of building components:
preliminary results from survey of building surveyors’ views,
Research Papers, No. 11, RICS
Ross T J (1995) Fuzzy logic with engineering applications:
international edition, McGraw-Hill Inc
Ruegg R T and Marshall H E (1990) Building economics:
theory and practice, Van Nostrand Reinhold, New York
Salway F (1986) Depreciation of commercial property, College
of Estate Management
Seeley I H (1996) Building economics: fourth edition,
Macmillan Press Ltd
Smith D K (1999) Total life-cycle cost, Proceedings of the
eighth international conference on durability of building
materials and components, Vancouver, Canada,
Actions (login required)
Previous answers to this question
This is a preview of an assignment submitted on our website by a student. If you need help with this question or any assignment help, click on the order button below and get started. We guarantee authentic, quality, 100% plagiarism free work or your money back.